info@xboct.ca | (647) 401-7444 | 24/7 Licensed Electrical Contractor serving the GTA.

200A Service Upgrades

Electrical Service Upgrade in Toronto

XB Electric upgrades residential electrical services in Toronto from 60 or 100 amps to 200 amps, under ECRA/ESA licence #7016894. A 100-amp to 200-amp upgrade typically costs $3,000–$5,000 and up, depending mainly on how the service enters the property.

We calculate the load, file the ESA notification, coordinate the Toronto Hydro disconnect and reconnect, replace the service equipment, and hand you the inspection documentation at the end.

Most upgrades are triggered by one of four things: an EV charger, a heat pump or electric heating, a renovation that adds circuits, or a 60-amp service that has simply run out of capacity.

XB
XBOCT (XB) Electric Inc
Google
5.0 ★★★★★
950+
Completed Projects
Trusted by EV Owners

REQUEST AN ESTIMATE

Request My Estimate

Please enter your name so we know who we are speaking with.
Please enter the city where the project is located.
Please enter a valid phone number.
Please select at least one service.
0 / 180
Please confirm you understand the typical project cost range before submitting your request.

Uploading photos of your electrical panel and meter helps us review your setup and provide a faster estimate.

☁️ Drag and Drop (or) Choose Files


Toronto pricing

How Much Does an Electrical Service Upgrade Cost in Toronto?

100-amp to 200-amp service upgrade

$3,000–$5,000

A 100-amp to 200-amp service upgrade in Toronto typically costs $3,000–$5,000 and up.

The biggest variable is how power reaches your house.

Overhead

An overhead service, where the wires run from a pole to a mast on your roofline, is the straightforward version.

Underground

An underground service means the work extends below grade, and that costs more — sometimes considerably more.

After that, what moves the price is the condition of what we are replacing: whether the mast and meter base need replacing along with the panel, how far the panel sits from the meter, whether the grounding and bonding meet current code, and whether opening up the service exposes corrections that have to be made before it passes inspection.

The ESA permit and inspection are included in the quoted price. We confirm the full scope and the number before the work is booked.

Know the difference

Service Upgrade or Panel Replacement — Which Do You Need?

These get used interchangeably and they are not the same job, so it is worth knowing which one you are buying.

Your electrical service

Your electrical service is everything that brings power from the utility into the building: the service entrance conductors, the mast or underground feed, the meter base, the main disconnect, and the panel. The service size in amps sets the maximum power the property can draw.

Your panel

Your panel is one component inside that service — the box that distributes power to individual circuits. Replacing a panel at the same amperage fixes the panel. It does not give you more power.

So if your 100-amp service is at its limit, a new 100-amp panel will not solve it. If the service size is fine but the panel is old, full, or a fuse box, a panel replacement is the cheaper and correct answer. A load calculation is what settles it, and we run one before quoting either way.

Scope

Can You Upgrade the Service Without Rewiring the House?

Yes, in most cases. A service upgrade replaces the equipment between the utility and your panel, plus the panel itself. The branch circuits running through your walls are reconnected to the new panel and stay where they are.

Rewiring becomes part of the conversation only when the existing branch wiring is itself a problem — knob-and-tube, or aluminum branch wiring with failing connections. We tell you if we find it, and we quote it separately rather than folding it in.

What the Upgrade Replaces

  • Service entrance conductors from the utility connection
  • The service mast and meter base, where they need replacing
  • The main disconnect
  • The electrical panel, with room for the circuits you are adding
  • Grounding and bonding brought up to current Ontario Electrical Safety Code
  • The load calculation that sizes all of it

The sequence

Toronto Hydro and ESA: How the Sequence Works

A service upgrade is not a job you can simply book for a Tuesday. Two organizations control gates in the middle of it, and knowing the order explains where the time goes.

  1. Load calculation and service layout.

    We calculate your current and planned load, then request the service layout from Toronto Hydro. That layout sets out exactly what the utility supplies and installs, and what we install.

  2. Notification and request.

    We file the ESA notification of work under licence #7016894 and submit the Toronto Hydro service upgrade request with the load calculation and drawings the utility requires.

  3. Disconnect and install.

    Toronto Hydro disconnects the service. We replace the service equipment. Your power is off while that work is done.

  4. Inspection.

    ESA inspects the new service. Only ESA can authorize the reconnection — Toronto Hydro cannot energize the upgraded service without it.

  5. Reconnect.

    Once ESA issues the connection authorization, Toronto Hydro reconnects and energizes the service. You get the inspection documentation for your records. Keep it — insurers and buyers ask for it.

The two things that stretch a project are utility scheduling and inspection booking, not the installation itself. We tell you the realistic window when we quote, not after you have committed.

Photo estimate

Get a Written Estimate

Send photos of:

  • The electrical panel with the door open, breakers visible
  • The main breaker rating
  • The electrical meter
  • Where the wires enter the property — the mast on the roofline, or the point where an underground feed comes in

That last photo is the one that decides the price, so include it even if you are unsure what you are looking at.

Tell us what is driving the upgrade — an EV charger, a heat pump, a renovation, or a panel that has run out of space. We review the photos, confirm the scope and the price, and book the work around Toronto Hydro's availability.

Toronto and the GTA

XB Electric is a licensed electrical contractor serving Toronto and the GTA, with 950+ completed projects and pricing confirmed before work begins.

Call us directly (647) 401-7444

Service Upgrades